A raked sand plot with orange survey pegs and string, seen from across the road The plot excavated, with a piling rig, a concrete pump and two workers in hard hats A three-storey concrete frame topped out, with a tower crane and orange safety netting The building clad in pale render with aluminium windows, scaffolding half removed

Forty-eight homes in Al Furjan. You will see the site every month.

0%built

Three floors around a courtyard, with a pool. Completion in 2028.

Pick a home

Payment plan

Pick a home to fill in the amounts.

    Book a site visit

    Foundations.

    Piling and the raft slab.

    Your second payment is due when this photo is taken.

    Structure.

    Columns and slabs, one floor every three weeks.

    Studio
    42 sqm
    One bedroom
    68 sqm
    Two bedroom
    104 sqm

    Facade andwindows.

    Pale render, aluminium frames, double glazing.

    Inside.

    • Oak floors
    • Stone counters
    • Brushed steel taps

    The same in every home.

    Three material samples on a bare concrete floor in window light: pale oak flooring, grey-veined stone and a brushed steel tap
    The building clad in pale render, scaffolding half removed The finished three-storey building with young trees planted along the road